|

Folsom Lake Crossing lane closed for repairs

FOLSOM — One westbound lane of Folsom Lake Crossing will be closed beginning through July 1 to repair a drainage canal near the bridge.

One of the westbound lanes of Folsom Lake Crossing will be closed to vehicle traffic weekdays from 8:00 a.m. to 3:30 p.m. The closed lane, which includes the westbound bicycle lane, will be used for heavy equipment during construction hours.

The adjacent two-lane bicycle and pedestrian path will remain open, but may close periodically to allow the movement of heavy vehicles in the area. All pedestrian and bicycle traffic from the bike path must proceed with caution and obey all posted traffic signs and designated traffic control personnel.

Heavy rains have eroded the drainage canal on federal land that faces the Folsom Dam. This erosion does not pose any safety risk to the public.

Any questions or concerns about the construction may be directed to the U.S. Army Corps of Engineers Sacramento District Public Affairs Office at (916) 557-5100.

Short URL: http://www.villagelife.com/?p=30962

This story falls on page "3"
Posted by on Apr 21 2013.
Last Login:
Filed under News. You can follow any responses to this entry through the RSS 2.0. You can leave a response or trackback to this entry

Leave a Reply

Recently Commented

  • Mark 2: OR Parent. The tablet program was a pilot to work out the bugs of what is best. Without it, the district...
  • Liz: Did another search and US News came out with national rankings. Granite Bay is 438 OR is 577 Folsom 863 Vista 817
  • Liz: I did a search of top schools in California. Schooldigger.com shows that Oak Ridge is in the top 100 while...
  • Liz: OR Parent – Life is about choices….If you disagree with the way a school is running, do something...
  • OR Parent: Why the discussion? Because of the heavy weighting of expenditures on athletic facilities versus academic...