|

Folsom Lake Crossing lane closed for repairs

FOLSOM — One westbound lane of Folsom Lake Crossing will be closed beginning through July 1 to repair a drainage canal near the bridge.

One of the westbound lanes of Folsom Lake Crossing will be closed to vehicle traffic weekdays from 8:00 a.m. to 3:30 p.m. The closed lane, which includes the westbound bicycle lane, will be used for heavy equipment during construction hours.

The adjacent two-lane bicycle and pedestrian path will remain open, but may close periodically to allow the movement of heavy vehicles in the area. All pedestrian and bicycle traffic from the bike path must proceed with caution and obey all posted traffic signs and designated traffic control personnel.

Heavy rains have eroded the drainage canal on federal land that faces the Folsom Dam. This erosion does not pose any safety risk to the public.

Any questions or concerns about the construction may be directed to the U.S. Army Corps of Engineers Sacramento District Public Affairs Office at (916) 557-5100.

This story falls on page "3"
Posted by on Apr 21 2013.
Last Login:
Filed under News. You can follow any responses to this entry through the RSS 2.0. Both comments and pings are currently closed.

Comments are closed



Recently Commented

  • Diane Orciuoli: Well written Ann, Thank you for speaking up! I agree with you 100%.
  • James Scott: This article was the first I’d heard about this and it boggled my mind that there was actually a...
  • Veronica Spires: We love the Blue Oak Montessori program! I am a teacher by profession (not at Blue Oak since I have...
  • Ian Wyatt: We met with the David and Jackie and we are informed that Blue Oak is not over-crowded and that the...
  • yvonne morris: I’ve seen many local kids using this trail for their bikes. They’ve always been nice and...